Research on Off-Design Performance for Commercial Demonstration PFBC-CC Plants

裘放放,蔡宁生,肖军,郑莆燕
DOI: https://doi.org/10.3969/j.issn.1674-7607.2002.04.003
2002-01-01
Abstract:The steady off-design and part-load performance for commercial demonstration PFBC power plant of 100 MWe rate are studied in this paper. Effect of variants in fluid bed boiler on plant performance, contribution to power generation from steam cycle and gas cycle and their match and coordination are discussed. The system output under variant loads and different operating conditions are also forecasted. Figs 8, tables 2 and refs 7.
What problem does this paper attempt to address?