STUDY ON DESIGN OF THE FIRST HOME-MADE CFB BOILER USED FOR 330MW UNIT

SUN Xian-bin,YU Long,SHI Zheng-hai,ZHANG Yan-jun,LI Zhi-wei,ZHANG Man,HUANG Zhong,JIANG Min-hua
DOI: https://doi.org/10.3969/j.issn.1002-3364.2009.11.019
2009-01-01
Abstract:On the basis of developing CFB boiler used for 210 MW unit,the key technologies of manufacturing large CFB boilers has been systematically studied,and the schematic design of home-made CFB boiler for 330 MW unit being carried out,the structure design of key components and scaling-up characters being analysed and numerically simulated.Results in practical operation show that the first home-made CFB boiler for 330 MW unit boasts uniform fluidization,stable bed body,as well as good characters for adjustment of bed temperature and steam temperature,each parameter of performance reaches the designed value.At the same time,it shows that the key technologies of large-capacity CFB boilers have been completely mastered in China.