The Update Progress Of Compact Design Cfb Boiler With Square Cyclone

Mm Wang,J Lu,Gx Yue,Js Zhang,Q Liu,Jz Shen,J Li,X Su
2003-01-01
Abstract:More attention is focused on since the appearance of compact CFB design. After the first pilot 75 t/h CFB boiler with water cooled square cyclone was put into operation successfully I and some shortcoming in this design was overcome, more than 80 units of this capacity boiler share the Chinese CFB market. Because of the advantage in scaling up, the 130 t/h capacity was easily developed triumphantly. Based on the success of tens of 75 t/h and 130 t/h CFB boilers with water-cooled square cyclone, the first 116MWe hot water CFB boiler, which is the biggest capacity hot water CFB boiler, began operating in the end of 2000 at Shiguang heat company, Hebei Province. It matches the rapid development of central heating system with lower emission coal fired hot water boiler for cities and communities in China. Then the first 220 t/h one was developed smoothly, which was put into operation in the end of 2001 at Weihai Cogeneration, Shandong Province. This boiler is one of the largest capacities CFB boilers with Chinese domestic technology. Its design and operating experience is also introduced in brief in this paper.
What problem does this paper attempt to address?