Research and Design of 330 MW Circulating Fluidized Bed Boiler

Sun Xianbin,Jiang Minhua,Yu Long,Zhang Yanjun,Shi Zhenghai,Wang Fengjun,Zhang Man,Huang Zhong
DOI: https://doi.org/10.1007/978-3-642-30445-3_86
2012-01-01
Abstract:Based on research and manufacture of 210MW circulating fluidized bed (CFB) boiler, the key technologies of large CFB boiler have been Research, the plan design of 330MW CFB boiler have been performed, construction design of key components and scaling up characteristics were analysed, The 330MW CFB boiler designed demonstration project has been put into commercial operation, It is the largest capacity CFB boiler operated in china now, Operation of 330MW CFB boiler was stable and good performance has been proved.