Study on Optimizing Preloading Water Head of Spiral Case Structure for Lager Hydropower Station

Tao Guo,Lixiang Zhang,Ji Yao
DOI: https://doi.org/10.3963/j.issn.1006-2823.2011.05.036
2011-01-01
Abstract:Spiral case is the core structure of powerhouse, therefore, choosing the right preloading pressure is critical to guarantee the safe and stable operation of station. In this paper, we use different preloading pressure for mechanical characteristics study of a large hydropower project with preloading water-filled spiral case. The numerical results shows that with the increase of the value of preloading pressure the stress states of surrounding concrete get better. But the too high preloading pressure, lead to the gap between the spiral case and surrounding concrete is too large, structure stiffness has been reduced, which may result in structure resonate. When the preloading pressure is 1.6 MPa, the stress state of surrounding concrete is reasonable and structure is unease to resonate. The numerical achievements are helpful to improve the design and construction of surrounding concrete of preloading water-filled spiral case structure.
What problem does this paper attempt to address?