Discussion on Mechanism and Stress Distribution Features of Diaphragm Walls of Pubugou Hydropower Station During Construction Period

陈科文,郑俊,邓建辉,吕洪旭
DOI: https://doi.org/10.3969/j.issn.1001-4179.2011.10.010
2011-01-01
Abstract:The dam of Pubugou Hydropower Station is a gravelly soil core rockfill dam,and its foundation is in a deep riverbed overburden layer with the maximum depth of 75.36m.The seepage works of the dam foundation overburden layer are two fully enclosed concrete diaphragm walls with 1.2m thick each.We discuss the stress distribution features.Firstly,according to the monitoring result of the strain of the station during construction period,we analyze the distribution features of the strain of the wall comprehensively.Secondly,based on concrete creep and stress relaxation theory,the strain of concrete is converted to stress using relaxation method.Finally,the distribution mechanism of diaphragm wall stress is discussed with consideration of all relevant factors.The conclusions are:(1) the proportion of deviator strain is basically within 5% and large eccentric compression does not appear in the diaphragm walls during construction.(2) The maximum compressive stress is in the central section of the diaphragm wall,and the measured values are 6 to 8 times larger than those in the top and bottom of the wall.(3) The important influential factor of the stress distribution of diaphragm wall is the negative friction formed by uneven settlement(uncoordinated deformation)of wall and the riverbed overburden layer,which should be emphasized in the structural design of the diaphragm wall.
What problem does this paper attempt to address?