Performance analysis of Xiluodu super-high arch dam in impounding period

罗丹旎,林鹏,李庆斌,王铖
DOI: https://doi.org/10.13243/j.cnki.slxb.2014.01.003
2014-01-01
Abstract:Whether a dam can undergo the test of impoundment is a key question of its safety. Based on the Xiluodu arch dam, considering nonlinear contact of transverse joints, the whole process of the first im-pounding is simulated by using nonlinear finite element method. The stress and the strain distribution char-acteristics of dam and foundation are investigated, and the stress and the aperture variation of transverse joints are analyzed. Besides, reasonable water level for good grouting of transverse joints is determined. On the whole, in impounding period, water loading causes the deflection of dam and foundation downstream and towards the banks of the river. Consequently, the principal tensile stress of dam on the upstream sur-face and the principal compressive stress of dam on the downstream surface are increasing, and the aper-ture variation of transverse joints tends to decrease. Meanwhile, the calculated results of the stress and the strain in some key areas of dam and foundation are compared with their monitoring results. They are in good agreements in their change rule and distribution regulation, and the reason for the difference between their values is analyzed by combining the situation of some domestic similar dams. In conclusion, the de-flection and the stress of dam and foundation and the behavior of transverse joints accord with running sta-tus of super-high arch dams under low water level, and the integrity stability meets the design require-ments in the first impounding period. With the increase of water level,the feedback analysis of the mechan-ical parameters of concrete and rock need to be conducted to achieve the dynamic evaluation of dam safety.
What problem does this paper attempt to address?