Calculation of Short-term Load-current for Power Cables

Ying LIU,Lei WANG,Xiaolong CAO,Xiyong XU,Wei JI
DOI: https://doi.org/10.13336/j.1003-6520.hve.2005.11.019
2005-01-01
Abstract:The calculation methods of short-term permissible load-current for power cables laid in air and buried in earth are introduced, and some relevant issues are studied, that is, the choice of the region number to divide the surrounding soil and the determination of the core temperature for cables that is not fully loaded. Based on them, and referring to the determination of parameters in current capacity as well, the methods to calculate the short-term load-current for cables buried in earth with backfill soil and laid in pipes in cement duct are presented and certified by simple calculation instances. The design means can be extended to other laying conditions of power cables.