Numerical Calculation of Real-Time Ampacity of High Voltage Power Cable Duct Laying Based on Environmental Information

Yuntu Jiang,Wen Dai,Xiaoyu Zhou,Jun Liu,Guanglei Wan,Linfeng Chen,Wei Li,Yuan Liu,Yuhan Jiang,Shiyou Yang
DOI: https://doi.org/10.1109/ciced63421.2024.10754276
2024-01-01
Abstract:In order to fully utilize the current-carrying capacity of power cables, it is demanding to accurately calculate cables real-time ampacity. In this point of view, a real-time ampacity calculation methodology based on environmental information is proposed. Firstly, a coupled multi-physics cable model is constructed. Secondly, the real-time environmental information is obtained based on a thermocouple and a distributed optical fiber temperature measurement system (DTS). Based on these, the real-time ampacity of cables is calculated by Newton method. The numerical results on a case study indicate that the real-time ampacity calculated by using the proposed methodology is approximately 39.08% higher as compared to the nominal ampacity.
What problem does this paper attempt to address?