Generator's leading phase operation and emergency voltage control of capacitive isolated network

Qian Pu,ZHANG Yi-wei,Lei Chen,Wei Hu,Jian Li,Jian Zhou,PANG Xiao-yan
2012-01-01
Abstract:When turning into isolated operation after a large disturbance,an export power network with little load and large charging power becomes capacitive. Special control problems are involved in the isolated operation’s safety. This paper presents that under-excitation limiter may fail to limit generator’s leading phase operation and even produces adverse effect on system operation, when the network is capacitive. For an isolated capacitive network, the paper suggests that properly reducing generator’s terminal voltage may make use of generation’s leading phase operation so as to achieve emergency voltage control of the system. Meanwhile, practical issues of the control process are discussed, and a multi-rounds and multi-steps’ emergency voltage control strategy is proposed accordingly.
What problem does this paper attempt to address?