Research on Evaluation the Variety of Particular Public Function Project Setting Status through 3-Year Construction of Disease Prevention and Control System

Chai Yuqing,Wang Ying,Luo Li,f H
DOI: https://doi.org/10.3969/j.issn.1006-7515.2007.03.002
2007-01-01
Abstract:Object evaluating the variety of particular public function project setting status through 3-year construction of disease prevention and control system.Method Data was obtained by the national system sampling survey,and compared by dif- ferent years.Result The research showed the particular public function project changes obviously through 3-year construction. 10 public function projects setting rate rises and 8 descend at city-level;while 12 rise and 5 descend at county-level.
What problem does this paper attempt to address?