Economic Benefit Analysis against the Improvement of Potential Transformer in Shouyangshan Power Plant

Chen Zhuo-ya,Shi Xiao-feng,Yuan Hong-pu,Ding Tao
2006-01-01
Abstract:According to the operation and electric energy metering condition in shouyangshan power plant, this paper analyzes the cause of big voltage-drop on secondary circuit of potential transformer and introduces the improvement of potential transformer. The economic benefit is calculated after the improvement. This leads to decrease the energy loss and promote the economic benefit.
What problem does this paper attempt to address?