Comparative Study on Economic Benefit Evaluation Methods for Power Transmission and Transformation Construction Projects Under DB Mode

Minquan Ye,Fangshun Xiao,Mengzhe Liu,Xuemei Zhu
DOI: https://doi.org/10.54097/3gtv9q96
2024-05-05
Abstract:By introducing and comparing the commonly used economic benefit evaluation methods for power transmission and transformation construction projects under the Design and Build(DB) mode, the paper investigates which method should be used for different purposes of economic benefit evaluation. On this basis, the advantages and disadvantages of these methods and their application conditions have been discussed in depth so as to provide useful references for the economic evaluation work.
What problem does this paper attempt to address?