Abstract:This paper introduces the optimum selection on pipe diameter of feed water system for Zhejiang Guohua Ninghai Power Plant PhaseⅡ 2×1 000 MW Extension Project.After advised calculation and analysis,comparing deferent schemes of pipe size of feed water system technically and economically,the optimized pipe specifications have been selected for low-pressure pipe,high-pressure pipe and recirculation pipe in the feed water system.
What problem does this paper attempt to address?