Calculation of Economic Benefit about Hydroelectric Based on Optimal Selection from Complex Project Group

WANG Hai-zheng,TONG Yun-huan,TAN Yi
DOI: https://doi.org/10.3969/j.issn.1007-3221.2006.05.017
2006-01-01
Abstract:Aiming at the existing problem of economic benefit calculation of the hydroelectric,hydroelectric optimal equivalent position in different running time is selected by mathematic models of the large system decomposition and coordination.Two tariffs are gradually being carried out in the electric systems,and marginal capacity cost and marginal quantity cost are regarded as capacity price and quantity price and are used to calculate hydroelectric economic benefit.Dynamic programming is adopted to carry out real time dispatch in hydroelectric by the optimal criteria of economic benefit.The example given in the paper indicates that the method and the model are feasible.
What problem does this paper attempt to address?