Optimization Design and Operation of CWS System in Wanfeng Heat Power Plant

HUANG Ying,LIU Jian-zhong,ZHOU Jun-hu
DOI: https://doi.org/10.3969/j.issn.1004-3950.2005.02.012
2005-01-01
Energy Engineering
Abstract:This paper introduces the CWS unload, storage, transportation for retrofitting 220t/h oil-fired boiler into CWS-fired one in Wanfeng heat power plant. According to the characteristics of CWS and the boiler operation, the pipeline lay, tank's partial design, circumference pipe of CWS system and operation method have been improved and optimized. The application result has shown that they are very affective on improving system safety operation.