Construction Technology of a Long Spiral Drilling Pipe CFG Pile

王宪忠,孙姿禄,祖秉新,李强,尹晓玲,袁淑芬,陈吴鹏,张敏
DOI: https://doi.org/10.3969/j.issn.1001-2427.2009.02.022
2009-01-01
Abstract:This paper introduces construction technology of a long spiral drilling pipe CFG pile,and adopted effective measures according to specific circumstances in construction.
What problem does this paper attempt to address?