Study on construction technology of percussive reverse circulation drilling hole forming squeezed branch pile

Jun-Yan Zeng,Hai-Qin Li,Wei-Dong Guan,Wen-Tong Zhu
DOI: https://doi.org/10.1088/1755-1315/787/1/012144
2021-06-01
IOP Conference Series: Earth and Environmental Science
Abstract:Abstract Taking No.65 pier of Zhongshan-Tanzhou express line as the background, the construction technology of percussive reverse circulation drilling hole forming squeezed branch pile is studied, the construction process of percussive reverse circulation drilling hole forming squeezed branch pile is defined, and through the field trial hole forming test, the points needing attention in field construction are summarized and improved: (1) The top elevation of the steel casing shall not exceed 30cm of the surface elevation, and the hole diameter of the percussion drilling hole shall be slightly larger than the designed hole diameter, so as to avoid the floating of the steel cylinder and the influence of too small hole diameter on the squeezing operation; (2) hole cleaning operation is an important factor for the success or failure of the squeezed branch pile construction, and the sediment thickness has a great influence on the bearing capacity of the pile foundation. After the expansion equipment is squeezed and the reinforcement cage is lowered, the hole cleaning is carried out, and the control points and mud parameters during each hole cleaning are clarified; (3) during the expansion process, the extrusion pressure value and the floating amount of the expansion equipment should be detailed, the geological information should be verified, and the bearing capacity of the pile foundation should be evaluated.
What problem does this paper attempt to address?