Unloading Simulation Analysis and the Field Monitoring for Xining Gymnasium Steel Roof

Wang Xiuli,Liang Baoxiang
DOI: https://doi.org/10.7672/sgjs2013200039
2013-01-01
Abstract:The change of the structural system must be considered in the construction process as the force of the large-span steel roof is different in the construction process and when it is completed.The paper raises the overall plan and monitors the structural displacement and the stress of the key joints in real time combining with the characteristics of the unloading engineering of Xining Gymnasium roof support.At the same time,the variation of the key rods' stress and structural deformation is confirmed and compared with the measured data using the software of finite element software ANSYS.The results show that the vertical altitudes accord with the design demands after unloading the roof support,the change of the stress in key rods is small comparing with that before unloading,and the change of the stress of all rods is slow during unloading.
What problem does this paper attempt to address?