Abstract:Based on the construction of tunnel between Taiyanggong and Sanyuanqiao of Beijing Subway Line 10,this article introduces technology of double pipe and non-shrinkage double liquid grouting WSS in treatment of reinforcing soil and interface water in vault area,and describes technologies of choosing and matching grouting materials,grouting parameter and arrangement of bore,and construction techniques.It provides an example for soil reinforcement and water seal in subway construction with WSS.