Experimental Study on Grouting Technology of Cement Emulsified Asphalt Mortar for CRTSⅡSlab Ballastless Track

Liu Jing,Zheng Xinguo,Xie Yongjiang,Han Zhiqiang,Ren Hongwei
2011-01-01
Abstract:To improve the filling degree of the mortar layer and reduce the bubbles of the mortar surface,the grouting technology of cement emulsified asphalt mortar for CRTSⅡslab ballastless track is studied by the contrast test of the real-foot transparent organic glass cover and the real concrete slab.The results show that if the technique parameters of cement emulsified asphalt mortar satisfy the requirements of grouting construction,it should adopt the new R & D funnel for grouting,the grouting height should not exceed 1.5 meters,and it should take about 4 minutes for grouting one plate of slab.The grouting speed should slow down when the mortar contacting the slab bottom near the observation port.When the mortar overflow out continuously,it must seal the vents and stop the grouting immediately.This grouting technology has been applied in Beijing-Shanghai High-speed Railway,Beijing-Shijiazhuang-Wuhan High-speed Railway and Shanghai-Hangzhou High-speed Railway construction successfully.The mortar grouted by this technology is much fuller and denser with less bubble on the interfaces.
What problem does this paper attempt to address?