Processing Configuration of Superfine Heavy Twist Ply in Preparation Process

Li Shunli,Pan Peng,Gao Jianmin,Kang Qiang
DOI: https://doi.org/10.3969/j.issn.1001-7415.2008.08.018
2008-01-01
Abstract:To resolve the problems that CJ 5.8 tex×2 heavy twist ply detwisted and entangled easily in weaving process,each measure of fixing twist in pre-weaving preparation processes were adopted.Self-regulating rubber cover was installed on yarn guider to avoid two single yarns separated in doubling process.To ensure ply good formation temperature of steaming yarn is set in 100℃ and the time is 60 minutes.Warping tension should be controlled slightly larger and warping speed was appropriate to be slower.Percentage of size was controlled at 8%,each zone warp tension,temperature of sizing box and pressure of squeezing roller were set rationally.After adopting the above measures defects that caused by heavy twist yarn entangling were reduced,loom efficiency reached 96%,Fabric of heavy twist ply with 1 550 twists per meter could be produced successfully.
What problem does this paper attempt to address?