NH3-N and TP removal performance of polluted river water with On-stream Detention Pond System

ZHU Mingjie,HU Hongying,HE Miao,GUAN Yuntao,ZHANG Jian
DOI: https://doi.org/10.3969/j.issn.1674-5906.2006.01.003
2006-01-01
Abstract:On-stream detention pond system(OSDPS) is an ecological technology,which is suitable and promising for purification restoration of polluted small-scale streams in China.Studying pollutants removal performance of OSDPS is meaningful.Field study of OSDPS was carried out,in which Hydraulic Retention Time(HRT) was changed and pollutants removal was detected.The results showed that particle settling was the main mechanism of removal of Total Phosphorous(TP).About 30% TP were removed after OSDPS purification and removal rate of TP varied between 0.01~0.02g.h-1.m-2.Moreover,removal rate of TP showed an obvious correlation with Suspended Solids(SS).Removal rate of TP was about 0.003 times as that of SS.So the removal rate of TP could be predicted by testing the removal rate of SS.However,the removal of NH3-N in OSDPS was not obvious.
What problem does this paper attempt to address?