Removal of nitrogen and phosphorus by integrated subsurface flow-upward vertical flow constructed wetland process

TIE Jingxi,ZHENG Zheng,ZHONG Yun,Luo Xingzhang,WANG Yong,KONG Gang,YU Xin
2006-01-01
Abstract:This paper studied the removal effects of NH~-_4-N,NO~-_3-N,TN and TP by the integrated subsurface flow-upward vertical flow constructed wetland process.When the treatment loading was 30 L·d~(-1) and the calculated hydraulic retention time(HRT) was 4.8 days,the process had good removals of NH~-_4-N,NO~-_3-N,TN and TP,and the average removals were 95%,52%,79%,81%,respectively.According to the operating time,the removal efficiency of the three nitrides could be divided into two phases,with the corresponding removals of NH~-_4-N,NO~-_3-N,TN being 93% and 99%,35% and 98%,and 71% and 98%,respectively,while the removal efficiency of TP was kept stable during the experiment.
What problem does this paper attempt to address?