Numerical Simulation Research on Final Forging Process of 700MW Class Heavy Hydro-generator Shaft

DONG Lanfeng,ZHONG Yuexian,MA Qingxian,YUAN Chaolong,MA Lishen
DOI: https://doi.org/10.16316/j.issn.1672-0121.2007.03.016
2007-01-01
Abstract:Based on the requirement and difficulty in forging process of 700MW class hydro-generator shaft,that take hollow upsetting to be the final step of the forging process of inner-flange has been suggested.Numerical FEA simulation results have indicated that integral hollow upsetting would bring satisfying inner strain distribution,the deformation of the final step would not exceed 60%,and partial hollow upsetting is more common in practice for it can easily meet the capacity of equipment.So the Chord Rotary Upsetting method has been suggested and studied in this text.It suggests that the optimum Topanvil Ingress Ratio should be about 40%,and the deformation of the final step should be less than 60%.The conclusions drawing from this paper are also applicable for the similar thin ring forgings.
What problem does this paper attempt to address?