Optimization of TISCO 3 200 m~3 BF Operation Technology

Yao hongxin,Yang Xiaodong,Zhang Guozhong,Xu Wei
DOI: https://doi.org/10.3969/j.issn.1006-110X.2011.04.004
2011-01-01
Abstract:TISCO 3 200 m3 BF had been maintained in a working state of low level since start-up.In order to change the state,strengthened measures of focusing on high quality burden,attempting a charging system suitable to TISCO BF,increasing the pressure difference between top of BF and the furnace and adopting big blasting flow rate with enriched oxygen and humidified blasting were taken after a study of the advanced experience and operating concept on BAOSTEEL was carried out.Good smelting results were obtained and all indices of TISCO 3 200 m3 BF promoted to the front rank domestically.
What problem does this paper attempt to address?