Complete Modification Rescheduling Method for Semiconductor Wafer Fabs

LI Li,QIAO Fei,XU Xiao-hong,WU Qi-di
DOI: https://doi.org/10.3969/j.issn.1006-5911.2006.07.011
2006-01-01
Computer Integrated Manufacturing Systems
Abstract:To solve rescheduling problem for semiconductor wafer fabs effectively,a swarmintelligence-based complete modification rescheduling method was proposed.Firstly,the Swarm-Intelligence-based Rescheduling Model(SIRM) was presented.Based on SIRM,the Complete Modification Rescheduling Algorithm(CMRA) was proposed.Finally,a simulation model based on an actual wafer fab was built to compare CMRA with the existing scheduling method in the fab.Simulation results showed that CMRA was prior to the existing method of the fab on movement,Work in Process(WIP)move speed and operation due date with better performance under uncertain chip manufacturing environment.At present,the proposed method has been applied to the actual wafer fab with better performance.