Hole-drilled bored pile cause analysis of quality accident and reinforcement treatments

ZHANG Xiao-bo,QU Jian-jun,MAO Nan-mei
DOI: https://doi.org/10.3969/j.issn.1009-6825.2010.20.044
2010-01-01
Abstract:In this paper combined with standard,a brief analysis of Three Gorges services branch of China Construction Bank building of the hole-drilled bored pile because of excessive sediment thickness during construction process,introduced methods of grouting reinforcement grouting materials,construction methods,grouting process and quality control measures.It is proposed that hole-drilled bored pile can be attentive in construction problems.