Control characteristics and Commission of GTCC

Hu Yu-ming,Guo Chuang-xin
DOI: https://doi.org/10.3969/j.issn.1003-9171.2007.08.008
2007-01-01
Abstract:Taking 9FA GTCC unit produced by GE in Hangzhou Banshan Gas Generation Project as an example,how to use MARK Ⅵ DCS of GE and OVATION DCS of Westinghouse were introduced in this paper to realize control of gas turbine,steam turbine,HRSG,auxiliary system and whole combined cycle.Common problems in commission of this type of unit such as ethernet communication breakdown of control system and longer starting time than design were analyzed.Finally feasible solutions to these problems were given.
What problem does this paper attempt to address?