The Design Characteristics And Construction Experiences Of The 5 Mwt Nuclear Heating Reactor

Wang Dazhong
DOI: https://doi.org/10.1016/0029-5493(93)90273-C
IF: 1.7
1993-01-01
Nuclear Engineering and Design
Abstract:The 5 MWt Nuclear Heating Reactor (NHR-5) is the first operated nuclear heating plant with an integrated vessel type light water reactor cooled by natural circulation. The NHR-5 was developed by the Institute of Nuclear Energy Technology. After about 3.5 years construction, the NHR-5 has reached criticality on November 3, 1989 and full power operation on December 16, 1989. Then the reactor has been operated successfull for three years in winter for space heating. The operational experience shows that NHR-5 has good inherent and passive safety features and excellent operation performance.