Experimental simulation on transit process of the 5MW nuclear reactor

Shenyao Jiang,Xinxin Wu,Meisheng Yao,Jinhai Bo,Shaorong Wu,YouJie Zhang
1996-01-01
Abstract:An experiment was performed on the heating reactor test loop HRTL-5, which simulates the geometry and system design of the 5MW reactor. It is suggested that the transit process, from initial condition to boiling operation condition, should consist of three steps: 1) increasing of initial pressure by means of a noncondensable gas (N2), which is a very effective method to eliminate geysering and flashing instability at lower pressure; 2) start up of the reactor at this pressurized condition with a constant heat flux under the limited value of 0.15MW/m2, which controls the exit temperature of the heated section below the one of net vapor generation, the low steam quality density wave oscillation can be avoided; 3) transition to a low pressure, boiling operation. Three transition methods are discussed. As a result of these studies, the method of transition with low heat flux and low inlet subcooling is proposed, during which the low steam quality density wave oscillation can be prevented from occurring. A stable start up process of the 5MW reactor is achieved by careful selection of thermohydraulic parameters. The studies are of great importance for the research of two phase flow instability, and for design and safety of the 5MW nuclear heating reactor.
What problem does this paper attempt to address?