Construction technology on post-mud-jack of grouting pile

SONG Wei-guo
DOI: https://doi.org/10.3969/j.issn.1009-6825.2006.06.062
2006-01-01
Abstract:It analyzes process and technical feature of construction technology of grouting pile after mud-jack, introduces its construction points from installation of injected pipe、mud-jack and post mud-jack of pile foundation, and puts forward control measures for key process and construction of post-mud-jack, the experiences indicates its benefit is good.