Abstract:AC ultra-high voltage project connecting to the load center area will increase greatly the short circuit current level of 500 kV grid in the receiving end.It is therefore an important issue to control the short circuit current.According to the location of Jinan ultra-high voltage substation and the structure of Shandong 500 kV grid,the 500 kV main connection of Jinan ultra-high voltage substation is proposed to adopt the unit connection mode of "one transformer,two lines" based on a multi-scheme comparison.This connection mode,while keeping the 500 kV grid structure,can effectively reduce the short circuit current level and meet the requirements of safety and reliability of power supply.