Under-deposit corrosion of tubing served for injection and production wells of CO2 flooding

Qiuyu Wang,Wei Wu,Qing Li,Deping Zhang,Yifan Yu,Bei Cao,Zhiyong Liu
DOI: https://doi.org/10.1016/j.engfailanal.2021.105540
IF: 4
2021-09-01
Engineering Failure Analysis
Abstract:<p>The tubing steel served for the injection and production wells of CO<sub>2</sub> flooding was investigated using various characterization methods. The results showed the corrosion failure of the tube was caused by the jointed action of sulfate-reducing bacteria (SRB), CO<sub>2</sub> and chloride ions (<span class="math"><math>Cl-</math></span>) during service. The corrosion product film formed on the tubing steel exhibited a bilayer structure. The outer layer was mainly composed of FeS and FeCO<sub>3</sub>, which was caused by SRB corrosion and CO<sub>2</sub> corrosion respectively, and the inner layer was primarily iron oxide and oxyhydroxide caused by <span class="math"><math>Cl-</math></span> enrichment and CO<sub>2</sub> corrosion. FeCO<sub>3</sub> was found in both layers. Accordingly, the synergistic effect of SRB and CO<sub>2</sub> resulted in the under-deposit corrosion, and the enrichment of <span class="math"><math>Cl-</math></span> accelerated the localized corrosion.</p>
engineering, mechanical,materials science, characterization & testing
What problem does this paper attempt to address?