Behavior of the Delaware River Bridge during repair

Yao Wang,Ashley P. Thrall,Theodore P. Zoli
DOI: https://doi.org/10.1016/j.jcsr.2020.106448
IF: 4.349
2021-02-01
Journal of Constructional Steel Research
Abstract:<p>This paper presents the behavior of the Delaware River Bridge, measured via the non-contact photographic measurement technique digital image correlation (DIC), as the bridge was repaired through vertical jacking and post-tensioning. Constructed in 1956 by American Bridge, the Delaware River Bridge is a continuous steel truss joining the New Jersey Turnpike and the Pennsylvania Turnpike. On January 20, 2017, a fracture was discovered in a W14 × 314 section in the upper chord of the north truss of the four-span continuous approach. The load redistributed to surrounding members, including a W14 × 87 upper chord member that buckled about its weak axis as well as adjacent verticals and sway bracing that deformed. Both the north and the south trusses also vertically deflected. The bridge was repaired by providing interim support using jacks on top of eight towers to stabilize the bridge. The fractured member was removed and replaced. Post-tensioning was used to restore the force in the replaced member and a permanent splice was installed. Throughout the repair, the full-field strains in the flanges of seven members near the fracture were monitored using DIC. Results indicate that the repair resulted in (1) uniaxial tension/compression in 6 of the 7 members and (2) flexural and axial tension strains in the buckled W14 × 87 upper chord member, all with magnitudes to be expected. This is the first application of DIC in monitoring a bridge during repair procedures and demonstrates the unprecedented information that DIC can provide on bridge behavior.</p>
construction & building technology,engineering, civil
What problem does this paper attempt to address?