Abstract:The purpose of this design is to master the basic steps, calculation methods, and equipment selection methods of the thermal power system of the thermal power plant, and to familiarize with the composition, connection, and operation characteristics of the thermal power system through the preliminary design of 600MW thermal power plant thermal power plant. This paper is divided into five parts, selecting the principle thermal system formulation, calculating the principle thermal system, the selection of unit auxiliary equipment, steam pipeline calculation, and selection after and after successful calibration. The preliminary design of the thermal system is completed by drawing the comprehensive thermal system diagram and the local system diagram using the above calculation data.