Parameters analysis of 600 MW + 120 MW peak load unit by integrated generate technology

Deren Sheng,HaoRen Ren,Jianhong Chen,Wei Li.,Bin Li
2001-01-01
Abstract:According the increasing demand of variable load, this paper presents that the hot-water regenerative cycle system should be introduced into the existing heat-engine plants and the new technique of integrated generation will be brought into being. When in low-load period at night, some excessive fuel and water are input and the hot water extracted from high-pressure heaters is deposited in some tanks, thus the nocturnal load is increased. When in high-load period in daytime, the hot water stored in tanks can be retaken into the integrated generate units to meet the demand of load variation, reduce the times of units' start and stop and alliviate the heat fatigue waste of equipments such as rotor and drum. This paper emphatically analyzes the system composition and the definition and selection of the main parameters. Also, according a 600 MW turbo-unit in some native power plant, it commits some analysis and computation and the outcome will become the foundation for further research.
What problem does this paper attempt to address?