Application of the Simple Wet Limestone/gypsum FGD System in Lianzhou Power Plant

Huan Li
IF: 3.475
2002-01-01
Environmental Technology
Abstract:After introducing the first wet limestone/gypsum FGD system in Guang Dong province, Lianzhou Power Plant,the main problems met in the operating period are analyzed emphatically.These include the mutual influences of FGD system and boiler?erosion of backend ductwork?discharging of gypsum slurry mixed with plant's ash slag water and the damage of agitators in absorber etc.. In the mean time ,the technical performance and economic performance of the FGD system are evaluated comprehensively. 
What problem does this paper attempt to address?