Technical and economic analysis on cancelling bypass gas duct in wet-FGD installations

BAI Yun-feng,XU Zheng-tao,WU Shu-zhi,GAO Xiang,LUO Zhong-yang,CEN Ke-fa
DOI: https://doi.org/10.3969/j.issn.1004-9649.2008.01.018
2008-01-01
Abstract:In view of the problems in FGD installations,such as low availability and increased SO2 emission,the function of bypass gas duct and the operation conditions of existing FGD equipment were introduced.The bypass gas duct was proposed to be cancelled;in addition,the influence on power unit and FGD operation was analyzed.It is feasible for the cancelling of bypass duct from the points of technical and management capacity of power industry.Considering the present situations,there's still a transitional stage to gradually realize the balance between construction and management of FGD installations and power generation units.