A feasibility study on the cancelation of booster fan in the FGD process of multi-furnaces with one tower

ZHANG Yan-feng,MA Yong-liang,XIANG Guang-ming
DOI: https://doi.org/10.3969/j.issn.1674-8069.2011.01.009
2011-01-01
Abstract:The booster fan has commonly been used in the wet flue gas desulfurization(FGD) process of multi-furnaces with one tower.However,it could cause many operational problems such as surge,stall and high energy consumption.Based on the design of FGD for three coal-fired boilers(220 t/h) in a thermal power plant,three options of the booster fan application scheme were evaluated,in terms of the performance,the energy consumption,and the cost of operation and maintenance.It was shown that the booster fan can be replaced by modifying the induced fan,after optimizing the gas system with CFD simulation.These results can be applied to the design of the FGD used for small and medium coal-fired power plants.