Rotary Construction Technology for the Main Bridge of Zhuanshen Highway Overpass Bridge

Jun Wang,Feng Wu
DOI: https://doi.org/10.59238/j.pt.2001.02x.007
2001-01-01
Abstract:PDF HTML XML Export Cite reminder Rotary Construction Technology for the Main Bridge of Zhuanshen Highway Overpass Bridge DOI: 10.59238/j.pt.2001.02X.007 Author: Affiliation: (The 11th Company of Transportation engineering Corporation of Jiangsu Province; Shanghai Songjiang Chengcheng Engineering Construction Supervision Co., Ltd) Clc Number: TU757 Fund Project: Article | Figures | Metrics | Reference | Related | Cited by | Materials | Comments Abstract:This paper discusses the construction technical problems such as rotary table grinding center, longitudinal girder arch rib construction system conversion and elevation adjustment of merging section in the construction of arch-beam combined transfer bridge. Reference Related Cited by