Analysis on the Monitoring Data of Induced Joints in Early Impoundment Period of Xiaowan Arch Dam

Lin Peng,Han Shidong,Hongwei Chen,Yulong Li
2010-01-01
Abstract:This paper introduced the safety monitoring result of induced joints at Xiaowan high arch dam.The actual state and the reasons for change of monitoring data of induced joints were presented.Further,the problem of high seepage pressure at certain part of the dam body was pointed out,for reference.