Safety Analysis For Transverse Joints Aperture Of Xiaowan High Arch Dam

Lf Xie,Xl Chang,W Zhou
2005-01-01
Abstract:If transverse joints aperture can't satisfy the demand of grouting, arch dam cannot be formed into a complete unit nicely, that will affect the safety of arch dam. In this paper, a 3-D nonlinear contact element is developed to represent the transverse joints of arch dam by using Sequential Quadratic Programming (SQP) based on augmented Lagrange method. The simulation program of temperature field and transverse joints aperture is developed. In the simulation program, all factors that influence transverse joints aperture are considered, such as thermal and mechanical properties, concrete construction process, variation of environment temperature, crown filling and water impoundment orders, and the different mechanical property of joint element before and after crown filling. The variation process of transverse joints aperture of Xiaowan high arch dam during construction is simulated based on the simulation result of temperature field. The simulation result shows that transverse joints apertures in most of the grouting regions can satisfy the requirements of joint grouting after second-stage cooling. Water impoundment presses the transverse joints tight after joint grouting, and the transverse joints will not be drawn open and needn't to be grouted again. After part extracooling 2 degrees C, all transverse joints that cannot be grouted satisfy the requirements of joint grouting.
What problem does this paper attempt to address?