Foundation Treatment for Sanliping RCC Double-Curved Arch Dam

Xiaoguang Yang
2010-01-01
Abstract:The geologic condition of Sanliping dam site is rather complicated,so several large diameter tunnels filled with concrete are built in the dam foundation.In addition,the loose bedrock are substituted to enhance the shearing resistance capability of the dam foundation.The 3-D FEM computation result shows that the sliding resistance capability of the abutment and the overload resistance capability of the arch dam are heightened.