Linac Construction for China Spallation Neutron Source

Shinian Fu,Jian Li,Huachang Liu,Hao Ouyang,Xin Yin
2012-01-01
Abstract:Construction of China Spallation Neutron Source(CSNS) has been launched in September 2011. CSNS accelerator will provide 100kW proton beam on a target at beam energy of 1.6GeV. It consists of an 80MeV H^{−} linac and 1.6GeV rapid cycling synchrotron. Based on the prototyping experience, CSNS linac, including the front end and four DTL tanks, has finalized the design and started procurement. In this paper, we will first present an outline of the CSNS accelerator in its design and construction plan. Then the major prototyping results of the linac will be presented. Finally the linac construction progress in recent will be updated.
What problem does this paper attempt to address?