Component Prototyping For The China Spallation Neutron Source Project

Jie Wei,Yanwei Chen,Yunlong Chi,Changdong Deng,Haiyi Dong,Shinian Fu,Wei He,Kaixi Huang,Wen Kang,Jian Li,Huafu Ouyang,Huamin Qu,Caitu Shi,Hong Sun,Jingyu Tang,Juzhou Tao,Sheng Wang,Zhongxiong Xu,XueJun Yin,Jing Zhang,Zonghua Zhang,XueJun Jia,TianJiao Liang,Fangwei Wang,Tao Zhu
DOI: https://doi.org/10.3938/jkps.54.1948
2009-01-01
Journal of the Korean Physical Society
Abstract:The China Spallation Neutron Source (CSNS) complex consists of an H- linear accelerator, a rapid cycling synchrotron accelerating the beam to 1.6 GeV, a solid tungsten target station and instruments for spallation neutron applications. The facility operates at a 25-Hz repetition rate with an initial design beam power of 120 kW and is upgradeable to 500 kW. The primary challenge is to build a robust and reliable user-friendly facility with upgrade potential at a fraction of the "world standard" cost. Success of the project relies on the results of prototyping research & development (R&D) of key technical systems and components. This paper discusses the prototyping experiences of the past two and a half years.
What problem does this paper attempt to address?