A 92.7% Peak Efficiency 48/1V DSD Power Converter with 102mv Droop and 1.6µs Settling Time for a 1a/10ns Load Transient.

Yongchao Zhang,Zhuoqi Guo,Zhongming Xue,Zhuoneng Li,Xihao Liu,Shangzhou Zhao,Dexuan Lv,Mengqi Duan,Li Geng
DOI: https://doi.org/10.1109/icta56932.2022.9963045
2022-01-01
Abstract:With the rapid growth of data centers, the power supply has shifted from 48/12/1V two-stage architecture to 48/1V single-stage. In this paper, a new two-phase sawtooth voltage mode PWM control is proposed for the double step-down (DSD) converter. In order to solve the problem of inherent cycle delay of PWM control, a fast-transient response scheme is proposed. The converter also has a precharge and soft start scheme, which is designed with a 0.18 µm BCD process. It achieves peak efficiencies of 92.7 % , 90%, 87.8%, and 86% at 250 kHz, 500 kHz, 750 kHz, and 1 MHz, respectively. During a 1A/10 ns load jump, the undershoot is reduced from 200 mV to 102 mV and the setting time is reduced from 5.3 µs to 1.6 µs.
What problem does this paper attempt to address?