On Engineering Risk about Design - Build General Contracting

HUANG Li,CUI Ming-hui,ZHAO Quan-sheng
DOI: https://doi.org/10.3969/j.issn.1008-6129.2005.03.022
2005-01-01
Abstract:Under Design-build general contracting mode,contractor takes great risk.Therefore,Design-Build contractor’s risk management is closely linked to the success of project execution. This article concentrates on risking factors analysis of both design and construction in Design-build general contracting project,then brings forward concrete method of risk avoidance,loosing control and risk transfer. The purpose is to turn risk into profit at last.