The General Contractor’s Risk Prevention Measures under EPC Mode

Hui GAO,Zong-jun WANG
DOI: https://doi.org/10.13991/j.cnki.jem.2016.01.021
2016-01-01
Abstract:The most of risks in engineering projects are transferred from the owner to the general contractor under the EPC mode. The widespread use of this mode made the general contractor face higher risks. In order to reinforce the contractor's capacity of risk prevention and control in the process of project implementation,this paper summarizes major risks which project phases faced in whole life cycle. On the basis of literatures review,the paper proposes specific prevention measures in the perspective of bid,design, procurement and construction. Then concludes project risk management method in the overall perspective and provides a reference for the general contractor about the aspect of risk control and prevention.