How to Deal with Project Change by Contractor

Hong-jun ZHOU,You-liang HUANG
DOI: https://doi.org/10.3969/j.issn.1007-9467.2008.02.036
2008-01-01
Abstract:characteristic of engineering itself,complexity of entironment and geologic circumstance,and that in design process reconnaissance designer cannot forecast all possible instances of construction period,all of these can result in project change inevitably for building engineering.Because of this,contractor shall exert the strategy of project change when bid and implement,and use visa method not claim to deal with it to the best of his abilities.Just do this,can benefit contractor,set up harmonious cooperate atmosphere,and make engineering accomplished successfully.
What problem does this paper attempt to address?